How to Get a New UPPCL Electricity Connection (Jhatpat Portal)

8 min read · Updated 21 July 2026

A new domestic electricity connection in Uttar Pradesh no longer needs a trip to the sub-division office. UPPCL's Jhatpat portal (jhatpatportal.uppcl.org) takes the application, documents, fees and even the cost estimate online for domestic (LMV-1) and commercial (LMV-2) connections. This guide walks through the whole flow — what to keep ready, what it costs, how long UPPCL is legally allowed to take, and how to push back when nothing happens.

1. What the Jhatpat portal is — and when to use it

Jhatpat ("instantly") is UPPCL's online new-connection scheme, launched in 2019 so that small consumers never have to chase a lineman or a babu for a form. It covers all five UP DISCOMs — MVVNL, PVVNL, DVVNL, PuVVNL and KESCO — from a single portal.

  • Fully online flow: domestic LMV-1 and commercial LMV-2 applications for small loads (the scheme was designed around connections up to 25 kW). Registration, document upload, fee payment and estimate payment all happen on the portal.
  • Higher loads still apply through the same portal, but expect a site inspection and a manually prepared estimate before sanction.
  • Not for: reconnections, name changes, load changes on an existing connection — those go through the UPPCL consumer portal (uppclonline.com), not Jhatpat. If you want a higher load on an existing connection, read our sanctioned-load guide instead.

2. Documents — keep these scanned before you start

The portal rejects nothing as often as a blurry ownership proof. One passport-size photo and two documents do most of the work:

RequirementAccepted documents
Identity proofAadhaar (used for OTP verification on the portal), voter ID, passport, driving licence or PAN.
Address / premises proofRegistry or sale deed, house-tax receipt, or rent agreement for tenants. The connection is issued for the premises, so this decides whose name goes on the bill.
PhotographOne passport-size photo of the applicant (JPEG upload).
BPL cardOnly if applying under the BPL category — it changes the registration fee and the default 1 kW load.

Tenants can apply. Supply is a statutory right of the occupier under Section 43 of the Electricity Act, 2003 — a rent agreement plus an indemnity/no-objection undertaking is the usual paper trail when the landlord will not sign.

3. The application, step by step

  1. Register on jhatpatportal.uppcl.org with your mobile number (OTP-verified) and choose urban or rural supply.
  2. Fill the application: district → DISCOM → sub-division are picked from dropdowns, then category (LMV-1 domestic / LMV-2 commercial) and the load you want. Ask for the load you realistically need — fixed charges are billed per sanctioned kW every month, so an oversized connection costs you forever. Our fixed-charges guide shows how to size it.
  3. Upload documents and pay the registration fee online — ₹10 for BPL applicants, ₹100 for others (verify the amount shown at the payment step; it is set by the Cost Data Book in force).
  4. Estimate generation. For small loads near an existing line the portal generates the estimate automatically from UPPCL's Cost Data Book; larger or far-from-line premises get a junior engineer's site visit first. The estimate bundles line charges, meter cost and security deposit (a per-kW amount that stays with UPPCL against your future bills).
  5. Pay the estimate online. This is the point the clock starts for meter installation.
  6. Meter installation and energisation. The meter serial number and your new 10/12-digit account number arrive by SMS. First bill follows in the next billing cycle.

4. What it costs — the three separate amounts

People quote wildly different "connection cost" figures because three different amounts get mixed up. Keep them separate:

  1. Registration fee — the small application charge (₹10 BPL / ₹100 others) paid when you submit.
  2. Estimate / line charges — the real cost, set by load, phase and the distance from the nearest pole, per the Cost Data Book. A 1–2 kW domestic connection next to an existing line typically lands in the low thousands of rupees; extra poles or cable raise it.
  3. Security deposit — refundable-with-interest per-kW deposit collected inside the estimate. It appears back on your side only at permanent disconnection, adjusted against dues.

We deliberately don't print rupee tables here — the Cost Data Book is revised, and a stale number is worse than none. The portal shows your exact estimate before you pay anything beyond the registration fee.

5. How long UPPCL can legally take

Two clocks apply, and the stricter one wins:

  • The central Electricity (Rights of Consumers) Rules, 2020 cap new connections at 7 days in metropolitan areas, 15 days in other municipal areas and 30 days in rural areas after a complete application.
  • The Jhatpat scheme's own service promise for small loads is a working connection within about 10 days of estimate payment.

Miss the deadline and the UP supply code entitles you to compensation — but in practice the useful lever is the complaint chain in the next section.

6. Application stuck? The escalation ladder

  1. Track first: the Jhatpat portal login shows the application stage (document verification → estimate → payment → installation), so you know where it is stuck.
  2. 1912 — UPPCL's 24×7 helpline; quote the application number and ask for a complaint number.
  3. The sub-division JE/SDO named on the portal for your area — most stalls are a pending site visit that one phone call unsticks.
  4. CGRF (Consumer Grievance Redressal Forum) of your DISCOM, then the Electricity Ombudsman, both free — the statutory route when the deadline in section 5 has lapsed.

7. After the meter arrives — check your first bill

New connections are where category and load errors are born. On the first bill, verify the tariff category (LMV-1 for a home), the sanctioned load you applied for, and the meter number. Then put your units into our UPPCL bill calculator — it implements the current slab, fixed-charge, FPPA and duty logic, verified against real UPPCL bills — and compare. Our UPPCL bill-reading guide decodes every line, and Bill Review can check a suspicious first bill for free.

Frequently asked questions

What is the Jhatpat connection scheme of UPPCL?
Jhatpat is UPPCL’s online new-connection scheme (jhatpatportal.uppcl.org) covering all five UP DISCOMs. Domestic LMV-1 and commercial LMV-2 applicants register, upload documents, pay the registration fee and the system-generated estimate online, with small loads promised a working connection in about 10 days.
What documents are required for a new UPPCL connection?
Identity proof (Aadhaar is used for portal OTP verification), premises proof (registry, house-tax receipt or rent agreement for tenants), one passport-size photograph, and the BPL card if applying under the BPL category.
What is the UPPCL new connection registration fee?
The registration fee is nominal — ₹10 for BPL applicants and ₹100 for others. The real cost is the estimate (line charges, meter and security deposit) generated from UPPCL’s Cost Data Book after the application, which the portal shows before you pay.
How many days does a new UPPCL connection take?
Under the Electricity (Rights of Consumers) Rules, 2020, a complete application must be energised within 7 days in metropolitan areas, 15 days in other municipal areas and 30 days in rural areas. The Jhatpat scheme itself promises roughly 10 days for small loads after estimate payment.
Can a tenant get an electricity connection in UP without the landlord?
Yes. Section 43 of the Electricity Act, 2003 gives the occupier of a premises the right to supply. A rent agreement plus an indemnity/no-objection undertaking is the usual documentation when the owner will not sign the application.

Now check your own bill

Reading is half the job — run your own units through your DISCOM's real slab rates, fixed charges and FPPA and get an itemised bill in seconds. Free, no sign-up.

Open the electricity bill calculator →

Related on TheDiscomBill

More guides

General guidance based on publicly available tariff orders and regulations; specifics vary by state, DISCOM and consumer category. Verify against your DISCOM's official schedule or your printed bill.