Erstwhile DPL area Smart Meter Recharge — How to Recharge Online

Everything you need to recharge a Erstwhile Durgapur Projects Ltd. area — supplied by WBSEDCL prepaid smart meter online — for billed by WBSEDCL on the frozen erstwhile-DPL schedule and the rest of Durgapur industrial and urban area, plus a units-per-recharge estimate computed from the real Erstwhile DPL area tariff rates.

How to recharge a Erstwhile DPL area smart meter

  1. 1
    Open the recharge channelRecharge on the official Erstwhile DPL area portal or app, or through BBPS-enabled UPI apps (PhonePe, Google Pay, Paytm etc.) by selecting "Erstwhile DPL area".
  2. 2
    Enter your consumer / meter numberYou'll find it on your smart meter card, an old bill, or the meter's display.
  3. 3
    Pick an amountUse the table below to gauge roughly how many units your money buys.
  4. 4
    PayUPI, debit/credit card or net-banking — keep the payment receipt.
  5. 5
    Watch the balance updateThe balance usually updates within minutes; occasionally it can take a few hours. Check the meter display or the app.

How many units does a recharge buy on Erstwhile DPL area?

A rough estimate computed from Erstwhile DPL area's real domestic slab rates (₹2.5–₹4.99/unit). Remember — your prepaid balance doesn't only pay energy charges: fixed charges, FPPA and electricity duty are deducted daily too, so actual units will be somewhat lower.

Recharge amountApprox. units
₹200≈ 40 – 80 units
₹500≈ 100 – 200 units
₹1,000≈ 200 – 400 units
₹2,000≈ 400 – 800 units

Open the exact Erstwhile DPL area bill calculator →

What happens when the balance runs low or out?

You get low-balance alerts (SMS/app notification) from the meter. If the balance goes negative, supply can be disconnected automatically — though most DISCOMs do not disconnect at night, on Sundays or on holidays (rules vary by DISCOM). Once you recharge, supply is normally restored automatically with no separate reconnection fee. Full details in our guide: prepaid smart meter disconnection rules →

Erstwhile DPL area smart meter recharge at a glance

DISCOMErstwhile Durgapur Projects Ltd. area — supplied by WBSEDCL
State / UTWest Bengal
Service regionDurgapur industrial and urban area
Domestic energy rate₹2.5 – ₹4.99 per unit
Tariff year2025-26

More smart meter help

Frequently asked questions

How do I recharge my Erstwhile DPL area smart meter?
Recharge on the official Erstwhile DPL area portal or app, or through BBPS-enabled UPI apps (PhonePe, Google Pay, Paytm etc.) by selecting "Erstwhile DPL area". Pay by UPI, card or net-banking; the balance usually updates within minutes.
How many units does a ₹500 recharge give on Erstwhile DPL area?
Erstwhile DPL area's domestic rate spans ₹2.5–₹4.99 per unit, so ₹500 buys roughly 100–200 units — a little less after fixed charges, FPPA and duty are deducted.
What is the minimum recharge amount?
The minimum varies by DISCOM — the exact limit is shown on the official portal/app at recharge time. Rather than many small top-ups, one recharge sized to your typical monthly consumption is usually more convenient.
I recharged but power hasn't come back — what now?
After a successful payment, supply is normally restored automatically; give it a few minutes. If not, check the balance on the meter display, keep your receipt, and raise a complaint on 1912 or your DISCOM helpline.

General guidance — recharge channels, minimum amounts and disconnection rules vary by DISCOM. Always pay only on the official Erstwhile DPL area portal/app or a BBPS-enabled app; TheDiscomBill never asks for your account number, OTP or password. See recharge guides for every DISCOM →