Gujarat Electricity Tariff 2026-27 — Slab Rates by DISCOM

Tariffs last updated: 27 August 2026

Calculate your provisional electricity bill for any of Gujarat's 4 distribution companies — UGVCL, MGVCL, PGVCL, DGVCL — with a full slab-wise breakdown for 2026-27, covering Mehsana, Patan, Banaskantha, Sabarkantha, Gandhinagar, Aravalli and more.

Calculate your Gujarat electricity bill

Slab rates, fixed charge, fuel surcharge and duty for 2026-27, applied to your own units. Nothing you enter leaves your browser.

Domestic supply. The bracket in each option is the eligibility limit — pick the one your connection actually falls under, because the rates differ sharply between them. For commercial supply, time-of-day, solar export or arrears, the full calculator carries every field.

Gujarat electricity tariff (2026-27)

All 4 DISCOMs in Gujarat bill on the same schedule, set by the state regulator — so the rates below apply whichever company serves you.

RGP (Residential General Purpose)

Supply typeEnergy chargeFixed chargeDuty & other
RGP — Urban / non-Gram-Panchayat
  • 0 – 50 units₹3.05/unit
  • 50 – 100 units₹3.50/unit
  • 100 – 250 units₹4.15/unit
  • Above 250 units₹5.20/unit
  • up to 2 kW₹15/mo
  • above 2 to 4 kW₹25/mo
  • above 4 to 6 kW₹45/mo
  • above 6 kW₹70/mo
  • Electricity Duty (ED)15%
RGP (Rural) — within Gram Panchayat
  • 0 – 50 units₹2.65/unit
  • 50 – 100 units₹3.10/unit
  • 100 – 250 units₹3.75/unit
  • Above 250 units₹4.90/unit
  • up to 2 kW₹15/mo
  • above 2 to 4 kW₹25/mo
  • above 4 to 6 kW₹45/mo
  • above 6 kW₹70/mo
  • Electricity Duty (ED)7.5%

Who each rate applies to

RGP — Urban / non-Gram-Panchayat
Residential premises outside Gram Panchayat areas
RGP (Rural) — within Gram Panchayat
Residential premises inside a Gram Panchayat as defined in the Gujarat Panchayats Act

ℹ️ Smart-meter consumers get a 60 paise/unit Time-of-Use concession for consumption between 1100 and 1700 hrs. BPL households pay ₹5/month fixed and 150 paise/unit on the first 50 units.

Non-RGP (Commercial / Non-Industrial, up to 40 kW)

Supply typeEnergy chargeFixed chargeDuty & other
Contracted load up to 10 kW
  • Above 0 units₹4.35/unit
  • first 10 kW₹50/kW/mo
  • next 30 kW₹85/kW/mo
  • Electricity Duty (ED)20%
Contracted load above 10 kW
  • Above 0 units₹4.65/unit
  • first 10 kW₹50/kW/mo
  • next 30 kW₹85/kW/mo
  • Electricity Duty (ED)20%

Who each rate applies to

Contracted load up to 10 kW
Entire monthly consumption at 435 paise per unit
Contracted load above 10 kW
Entire monthly consumption at 465 paise per unit, plus a 45 paise/unit peak-hour charge

ℹ️ Above 10 kW, consumption during the two peak windows (0700–1100 and 1800–2200 hrs) carries an extra 45 paise/unit. Connections above 40 kW fall under LTMD instead.

AG (Agriculture / Irrigation)

Supply typeEnergy chargeFixed chargeDuty & other
AG (Agriculture / Irrigation)
  • Above 0 units₹0.60/unit
₹0/mo

ℹ️ Heavily subsidised; the order's headline AG tariff is HP-based at ₹200 per HP per month. Actual supply hours are limited.

Common Gujarat bill calculations

Typical domestic examples for a 2 kW RGP (Residential General Purpose) connection, computed with the same engine as the calculator. Use them as a quick sanity check; your actual bill changes with sub-category, arrears, FPPA, duty and billing-period length.

Monthly consumptionEstimated bill
200 units₹869
300 units₹1,407
500 units₹2,603
750 units₹4,098

Calculate my exact Gujarat bill →

Electricity DISCOMs in Gujarat

Select your distribution company to see its 2026-27 tariff schedule, service area and an indicative monthly bill.

Wrong bill in Gujarat? Where to complain

Complain in this order and keep the complaint number at every step. Skipping a step is the commonest reason a genuine billing complaint is returned unheard.

StepWhere it goesWhat you need
1. DISCOM complaint deskUGVCL · MGVCL · PGVCL · DGVCL, or the 24×7 helpline 1912Consumer number, bill number, the one disputed line, and a meter photo
2. Consumer Grievance Redressal Forum (CGRF)Your DISCOM's forum, constituted under GERC regulationsThe first complaint number, and what the DISCOM did or failed to do about it
3. Electricity OmbudsmanThe Ombudsman appointed by GERCThe CGRF order, or proof the forum missed its deadline

Two deadlines worth knowing. Under the central Electricity Rights of Consumers Rules a grievance should normally be decided within 30 days and in any case within 45. And if the paper you received is an assessment under Section 126 for unauthorised use rather than an ordinary bill, it does not go to the CGRF at all — it is appealed to the Appellate Authority under Section 127, usually within 30 days.

Read the full complaint playbook, with wording you can copy →

More Gujarat electricity tools

Electricity tariffs across West India

Frequently asked questions

How is the electricity bill calculated in Gujarat?
Gujarat bills combine slab-wise energy charges, a fixed/demand charge per kW (or kVA), a fuel & power purchase adjustment (FPPA) and electricity duty. Use our free calculator to get an itemised provisional bill for your DISCOM.
Which electricity distribution company serves my area in Gujarat?
Gujarat is served by 4 DISCOMs: UGVCL (North Gujarat — Mehsana, Patan, Banaskantha); MGVCL (Central Gujarat — Vadodara, Anand, Kheda); PGVCL (Saurashtra & Kutch — Rajkot, Jamnagar, Junagadh); DGVCL (South Gujarat — Surat, Bharuch, Narmada). Open your DISCOM above for its full tariff and an indicative bill.
What is the cheapest domestic electricity rate in Gujarat?
The lowest domestic energy charge across Gujarat DISCOMs starts at about ₹2.65 per unit (lowest slab), before fixed charges, FPPA and duty. Exact rates depend on your DISCOM and consumption slab.
Where do I complain about a wrong electricity bill in Gujarat?
File first with your DISCOM — UGVCL, MGVCL, PGVCL, DGVCL — or on the 24×7 helpline 1912, and keep the complaint number. If it is not resolved, escalate to your DISCOM's Consumer Grievance Redressal Forum (CGRF) and then to the Electricity Ombudsman, both constituted under GERC regulations. A grievance should normally be decided within 30 days and in any case within 45.
What is the current electricity tariff year for Gujarat?
The rates shown are for 2026-27 (latest available).

Provisional estimates based on publicly available Gujarat tariff orders (source: gercin.org/order-category/tariff-orders/). Verify against your official bill — rates vary by sub-category, slab and city.