LT-I(B) (Residential)
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
|
|
Calculate your provisional electricity bill for any of Maharashtra's 4 distribution companies — MSEDCL, Adani Electricity Mumbai, BEST Mumbai, Tata Power Mumbai — with a full slab-wise breakdown for 2026-27, covering except Mumbai city area served by Adani/BEST/Tata Power, Bandra, Andheri, Kurla, Borivali, Malad and more.
Slab rates, fixed charge, fuel surcharge and duty for 2026-27, applied to your own units. Nothing you enter leaves your browser.
Domestic supply. The bracket in each option is the eligibility limit — pick the one your connection actually falls under, because the rates differ sharply between them. For commercial supply, time-of-day, solar export or arrears, the full calculator carries every field.
Maharashtra's 4 DISCOMs are on separate schedules, so the rate depends on which one serves your address. Domestic slab ranges compared, with each full schedule below:
| DISCOM | Domestic slab range | Tariff year |
|---|---|---|
| MSEDCL | ₹4.32–13.97/unit | 2026-27 |
| Adani Electricity Mumbai | ₹2.65–8.35/unit | 2026-27 |
| BEST Mumbai | ₹2.02–11.25/unit | 2026-27 |
| Tata Power Mumbai | ₹1.90–10.24/unit | 2026-27 |
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
|
|
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-II(A) — up to 20 kW |
|
₹525/mo |
|
| LT-II(B) — 20 to 50 kW |
|
₹525/kVA/mo |
|
| LT-II(C) — above 50 kW |
|
₹525/kVA/mo |
|
Who each rate applies to
Full MSEDCL page — fuel surcharge, service area and bill guide →
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I (Residential) |
|
₹90–160/mo |
|
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| HT-I Industrial (HT · kVAh) |
|
₹400/kVA/mo |
|
ℹ️ HT-I industrial supply, kVAh based (MERC Case 211/2024, FY 2026-27) — demand charge ₹400/kVA/month on the recorded MD (floored at 75% of contract demand), energy ₹5.73 per kVAh plus ₹0.57 wheeling (apparent units = kWh ÷ power factor, so a poor PF raises the bill directly). Demand above contract demand is charged at 150% (state rule).
Full Adani Electricity Mumbai page — fuel surcharge, service area and bill guide →
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
₹90–160/mo |
|
Full BEST Mumbai page — fuel surcharge, service area and bill guide →
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
₹90–160/mo |
|
Full Tata Power Mumbai page — fuel surcharge, service area and bill guide →
Select your distribution company to see its 2026-27 tariff schedule, service area and an indicative monthly bill.
Complain in this order and keep the complaint number at every step. Skipping a step is the commonest reason a genuine billing complaint is returned unheard.
| Step | Where it goes | What you need |
|---|---|---|
| 1. DISCOM complaint desk | MSEDCL · Adani Electricity Mumbai · BEST Mumbai · Tata Power Mumbai, or the 24×7 helpline 1912 | Consumer number, bill number, the one disputed line, and a meter photo |
| 2. Consumer Grievance Redressal Forum (CGRF) | File with the CGRF, under MERC regulations | The first complaint number, and what the DISCOM did or failed to do about it |
| 3. Electricity Ombudsman | Office of the Electricity Ombudsman, appointed by MERC | The CGRF order, or proof the forum missed its deadline |
Two deadlines worth knowing. Under the central Electricity Rights of Consumers Rules a grievance should normally be decided within 30 days and in any case within 45. And if the paper you received is an assessment under Section 126 for unauthorised use rather than an ordinary bill, it does not go to the CGRF at all — it is appealed to the Appellate Authority under Section 127, usually within 30 days.
Read the full complaint playbook, with wording you can copy →
Provisional estimates based on publicly available Maharashtra tariff orders. Verify against your official bill — rates vary by sub-category, slab and city.