LT-I(B) (Residential)
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
₹90–160/mo |
|
Estimate your Brihanmumbai Electricity Supply and Transport (BEST) bill in seconds and browse the full 2026-27 tariff schedule — energy slabs, fixed/demand charges, fuel surcharge (FPPA) and electricity duty for South Mumbai – Colaba to Mahim/Sion and the rest of Mumbai Island City.
BEST Mumbai (Brihanmumbai Electricity Supply and Transport (BEST)) distributes electricity across Mumbai Island City, serving 1 key district and town including South Mumbai – Colaba to Mahim/Sion.
| Distribution company | Brihanmumbai Electricity Supply and Transport (BEST) |
|---|---|
| Short name | BEST Mumbai |
| State / UT | Maharashtra |
| Districts / cities served | 1+ — South Mumbai – Colaba to Mahim/Sion |
| Rates status | Based on the 2026-27 tariff order (latest published data we have) |
| Domestic energy rate | ₹2.02 – ₹11.25 per unit |
| Official website | www.bestundertaking.com ↗ |
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
₹90–160/mo |
|
Enter your units and sanctioned load for an itemised BEST Mumbai estimate. The result breaks the bill into energy charge, fixed or demand charge, FAC, duty, and late-payment surcharge where applicable.
Domestic supply. The bracket in each option is the eligibility limit — pick the one your connection actually falls under, because the rates differ sharply between them. For commercial supply, time-of-day, solar export or arrears, the full calculator carries every field.
| Latest verified FPPA | Not available |
|---|---|
| Applicable period | No verified period in tracker |
| Last updated | 2 September 2026 |
| Official source | No verified FAC source recorded yet |
Enter the surcharge printed on your bill manually in the calculator. Open the surcharge tracker.
Typical domestic examples for a 2 kW LT-I(B) (Residential) connection, computed with the same engine as the calculator. Use them as a quick sanity check; your actual bill changes with sub-category, arrears, FPPA, duty and billing-period length.
| Monthly consumption | Estimated bill |
|---|---|
| 200 units | ₹1,354 |
| 300 units | ₹2,157 |
| 500 units | ₹4,850 |
| 750 units | ₹8,592 |
The slab-wise price of the units consumed during the billing period. In telescopic slabs, each band is billed at its own rate.
A monthly charge linked to sanctioned load, connected load, billing demand or consumer category. It applies even when usage is low.
A statutory government levy. Depending on the state, it may apply on energy charges, fixed charges, or selected bill components.
Fuel and power-purchase adjustment. It changes more often than the base tariff and may appear as a charge or a credit.
Unpaid balance, corrections, security-deposit adjustments or previous-cycle amounts carried into the current bill.
Late Payment Surcharge on overdue amounts. Check the due date and pay through the official DISCOM channel to avoid it.
These services are provided by BEST Mumbai or the official state/DISCOM portal, not by TheDiscomBill. Use this block as a practical route map before you leave for the official site.
Use www.bestundertaking.com for the final bill, receipt and payment status. The calculator here is only for checking whether the charge lines look reasonable.
For supply, billing or meter complaints, use the official complaint portal first and keep the complaint number. The common electricity helpline in India is 1912 where supported by the state or DISCOM.
Apply for a new connection, ownership update or sanctioned-load change through the official portal. Match the load you apply for with the fixed-charge section in the tariff table below.
If your BEST Mumbai connection has a prepaid smart meter, check recharge channels, low-balance rules and unit estimates before topping up.
Estimate rooftop-solar savings here, then use the official DISCOM or PM Surya Ghar process for the actual net-metering application.
| Tariff order / regulator | merc.gov.in/wp-content/uploads/2025/03/Press-Note_MYT-Order_BEST_English.pdf |
|---|---|
| BEST Mumbai official information | www.bestundertaking.com |
| Tariff effective from | 2026-27 |
| Tariff basis | FY 2026-27 (MERC Case 207/2024) |
| Page updated | 2 September 2026 |
Figures are provisional estimates built on publicly available Maharashtra tariff orders. Always verify against your official BEST Mumbai bill — rates vary by sub-category, slab and city.