LT-I(B) (Residential)
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
|
|
Estimate your Maharashtra State Electricity Distribution Co. Ltd. bill in seconds and browse the full 2026-27 tariff schedule — energy slabs, fixed/demand charges, fuel surcharge (FPPA) and electricity duty for except Mumbai city area served by Adani/BEST/Tata Power and the rest of Maharashtra.
MSEDCL (Maharashtra State Electricity Distribution Co. Ltd.) distributes electricity across Maharashtra, serving 1 key district and town including except Mumbai city area served by Adani/BEST/Tata Power.
| Distribution company | Maharashtra State Electricity Distribution Co. Ltd. |
|---|---|
| Short name | MSEDCL |
| State / UT | Maharashtra |
| Districts / cities served | 1+ — except Mumbai city area served by Adani/BEST/Tata Power |
| Rates status | Based on the 2026-27 tariff order (latest published data we have) |
| Domestic energy rate | ₹4.32 – ₹13.97 per unit |
| Official website | www.mahadiscom.in ↗ |
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-I(B) (Residential) |
|
|
|
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| LT-II(A) — up to 20 kW |
|
₹525/mo |
|
| LT-II(B) — 20 to 50 kW |
|
₹525/kVA/mo |
|
| LT-II(C) — above 50 kW |
|
₹525/kVA/mo |
|
Who each rate applies to
Enter your units and sanctioned load for an itemised MSEDCL estimate. The result breaks the bill into energy charge, fixed or demand charge, FAC, duty, and late-payment surcharge where applicable.
Domestic supply. The bracket in each option is the eligibility limit — pick the one your connection actually falls under, because the rates differ sharply between them. For commercial supply, time-of-day, solar export or arrears, the full calculator carries every field.
| Latest verified FPPA | ₹0.00/unit |
|---|---|
| Applicable period | Jun 2025 - Jun 2025 |
| Last updated | 2 September 2026 |
| Official source | MERC prior-approval letter Ref. MERC/FAC/2025-26 dt. 05.12.2025: FAC approved at Rs 308.18 cr but added to the existing FAC Fund, leaving the FAC leviable for June 2025 at 0 (Zero); balance fund of Rs 376.58 cr carried forward |
No recent notice recorded — the entry shown is from Jun 2025 and is history, not a current rate. Enter the surcharge printed on your bill. Open the surcharge tracker.
Use the chart to see whether the variable surcharge is rising or falling. The selector switches between recent notices and the longer history currently available for MSEDCL.
Available series: Jun 2025 to Jun 2025. Some DISCOMs publish DISCOM-specific data; others use a state-wide FAC notice.
Typical domestic examples for a 2 kW LT-I(B) (Residential) connection, computed with the same engine as the calculator. Use them as a quick sanity check; your actual bill changes with sub-category, arrears, FPPA, duty and billing-period length.
| Monthly consumption | Estimated bill |
|---|---|
| 200 units | ₹1,962 |
| 300 units | ₹3,172 |
| 500 units | ₹6,314 |
| 750 units | ₹10,666 |
The slab-wise price of the units consumed during the billing period. In telescopic slabs, each band is billed at its own rate.
A monthly charge linked to sanctioned load, connected load, billing demand or consumer category. It applies even when usage is low.
A statutory government levy. Depending on the state, it may apply on energy charges, fixed charges, or selected bill components.
Fuel and power-purchase adjustment. It changes more often than the base tariff and may appear as a charge or a credit.
Unpaid balance, corrections, security-deposit adjustments or previous-cycle amounts carried into the current bill.
Late Payment Surcharge on overdue amounts. Check the due date and pay through the official DISCOM channel to avoid it.
These services are provided by MSEDCL or the official state/DISCOM portal, not by TheDiscomBill. Use this block as a practical route map before you leave for the official site.
Use www.mahadiscom.in for the final bill, receipt and payment status. The calculator here is only for checking whether the charge lines look reasonable.
For supply, billing or meter complaints, use the official complaint portal first and keep the complaint number. The common electricity helpline in India is 1912 where supported by the state or DISCOM.
Apply for a new connection, ownership update or sanctioned-load change through the official portal. Match the load you apply for with the fixed-charge section in the tariff table below.
If your MSEDCL connection has a prepaid smart meter, check recharge channels, low-balance rules and unit estimates before topping up.
Estimate rooftop-solar savings here, then use the official DISCOM or PM Surya Ghar process for the actual net-metering application.
| Tariff order / regulator | www.mahadiscom.in/consumer/wp-content/uploads/2025/08/MSEDCL-MYT-Order_Case_no_217-of-2024.pdf |
|---|---|
| MSEDCL official information | www.mahadiscom.in |
| FAC tracker | /fppa/maharashtra/ |
| Tariff effective from | 2026-27 |
| Tariff basis | FY 2026-27 (MERC Case 217/2024) |
| Page updated | 2 September 2026 |
Figures are provisional estimates built on publicly available Maharashtra tariff orders. Always verify against your official MSEDCL bill — rates vary by sub-category, slab and city.