Madhya Gujarat Vij Company Ltd. supplies power to 6+ districts including Vadodara, Anand, Kheda. Use this page to check MGVCL's 2026-27 tariff and calculate your provisional bill.
Madhya Gujarat Vij Company Ltd.
Service area: Central Gujarat (Vadodara, Anand, Kheda, Panchmahal, Dahod, Chhota Udaipur)
MGVCL (Madhya Gujarat Vij Company Ltd.) distributes electricity across Central Gujarat, serving 6 key districts and towns including Vadodara, Anand, Kheda, Panchmahal and more.
MGVCL scored 98.6 and ranks 5 of 54 state and private distribution utilities.
The rating scores the utility’s financial and operational performance — AT&C losses, billing and collection efficiency, the gap between what supply costs and what it earns, and the regulatory support the utility gets. It is not a measure of supply reliability or customer service, and it does not affect your tariff.
MGVCL applies the same state-wide 2026-27 tariff schedule as the other Gujarat DISCOMs (set by the state regulator). What differs by company is the service area, billing portal and contact details below.
RGP (Residential General Purpose)
Supply type
Energy charge
Fixed charge
Duty & other
RGP — Urban / non-Gram-Panchayat
0 – 50units₹3.05/unit
50 – 100units₹3.50/unit
100 – 250units₹4.15/unit
Above 250units₹5.20/unit
up to 2 kW₹15/mo
above 2 to 4 kW₹25/mo
above 4 to 6 kW₹45/mo
above 6 kW₹70/mo
Electricity Duty (ED)15%
RGP (Rural) — within Gram Panchayat
0 – 50units₹2.65/unit
50 – 100units₹3.10/unit
100 – 250units₹3.75/unit
Above 250units₹4.90/unit
up to 2 kW₹15/mo
above 2 to 4 kW₹25/mo
above 4 to 6 kW₹45/mo
above 6 kW₹70/mo
Electricity Duty (ED)7.5%
Who each rate applies to
RGP — Urban / non-Gram-Panchayat
Residential premises outside Gram Panchayat areas
RGP (Rural) — within Gram Panchayat
Residential premises inside a Gram Panchayat as defined in the Gujarat Panchayats Act
ℹ️ Smart-meter consumers get a 60 paise/unit Time-of-Use concession for consumption between 1100 and 1700 hrs. BPL households pay ₹5/month fixed and 150 paise/unit on the first 50 units.
Non-RGP (Commercial / Non-Industrial, up to 40 kW)
Supply type
Energy charge
Fixed charge
Duty & other
Contracted load up to 10 kW
Above 0units₹4.35/unit
first 10 kW₹50/kW/mo
next 30 kW₹85/kW/mo
Electricity Duty (ED)20%
Contracted load above 10 kW
Above 0units₹4.65/unit
first 10 kW₹50/kW/mo
next 30 kW₹85/kW/mo
Electricity Duty (ED)20%
Who each rate applies to
Contracted load up to 10 kW
Entire monthly consumption at 435 paise per unit
Contracted load above 10 kW
Entire monthly consumption at 465 paise per unit, plus a 45 paise/unit peak-hour charge
ℹ️ Above 10 kW, consumption during the two peak windows (0700–1100 and 1800–2200 hrs) carries an extra 45 paise/unit. Connections above 40 kW fall under LTMD instead.
AG (Agriculture / Irrigation)
Supply type
Energy charge
Fixed charge
Duty & other
AG (Agriculture / Irrigation)
Above 0units₹0.60/unit
₹0/mo
—
ℹ️ Heavily subsidised; the order's headline AG tariff is HP-based at ₹200 per HP per month. Actual supply hours are limited.
Estimate your MGVCL bill
Enter your units and sanctioned load for an itemised MGVCL estimate. The result breaks
the bill into energy charge, fixed or demand charge, FPPA, duty,
and late-payment surcharge where applicable.
Domestic supply. The bracket in each option is the eligibility
limit — pick the one your connection actually falls under, because the rates differ
sharply between them. For commercial supply, time-of-day, solar export or arrears, the
full calculator carries every field.
MGVCL FPPA — latest verified rate and trend
Latest verified MGVCL FPPA (Fuel and Power Purchase Adjustment)
Typical domestic examples for a 2 kW RGP (Residential General Purpose) connection, computed with the same engine as the calculator. Use them as a quick sanity check; your actual bill changes with sub-category, arrears, FPPA, duty and billing-period length.
The slab-wise price of the units consumed during the billing period. In telescopic slabs, each band is billed at its own rate.
Fixed charge
A monthly charge linked to sanctioned load, connected load, billing demand or consumer category. It applies even when usage is low.
Electricity duty
A statutory government levy. Depending on the state, it may apply on energy charges, fixed charges, or selected bill components.
FPPA (Fuel and Power Purchase Adjustment)
Fuel and power-purchase adjustment. It changes more often than the base tariff and may appear as a charge or a credit.
Arrears
Unpaid balance, corrections, security-deposit adjustments or previous-cycle amounts carried into the current bill.
LPSC
Late Payment Surcharge on overdue amounts. Check the due date and pay through the official DISCOM channel to avoid it.
Frequently asked questions
How do I calculate my MGVCL electricity bill?
Open the MGVCL bill calculator, enter your units consumed and sanctioned load, and it applies the 2026-27 MGVCL slab rates, fixed charge and other charges to produce an itemised provisional bill.
Which areas and cities does MGVCL serve?
MGVCL (Madhya Gujarat Vij Company Ltd.) supplies electricity to Central Gujarat — Vadodara, Anand, Kheda, Panchmahal, Dahod, Chhota Udaipur.
What is the cheapest domestic electricity rate on MGVCL?
MGVCL's domestic energy charge starts at ₹2.65 per unit and rises to ₹5.2 per unit in the highest slab (RGP (Residential General Purpose)), plus a monthly fixed charge (latest available estimate). The full slab table is above.
How do I pay my MGVCL electricity bill online?
Pay on the official MGVCL portal at www.mgvcl.com. Use this page first to check what your bill should be, then pay on the authentic source.
MGVCL consumer services
These services are provided by MGVCL or the official state/DISCOM portal, not by TheDiscomBill. Use this block as a practical route map before you leave for the official site.
Pay bill or download bill
Use www.mgvcl.com for the final bill, receipt and payment status. The calculator here is only for checking whether the charge lines look reasonable.
For supply, billing or meter complaints, use the official complaint portal first and keep the complaint number. The common electricity helpline in India is 1912 where supported by the state or DISCOM.
Apply for a new connection, ownership update or sanctioned-load change through the official portal. Match the load you apply for with the fixed-charge section in the tariff table below.
Figures are provisional estimates built on publicly available Gujarat tariff orders. Always verify against your official MGVCL bill — rates vary by sub-category, slab and city.