APDOP / Dept. of Power Electricity Tariff 2026-27 — Slab Rates & Fixed Charges
Department of Power, Government of Arunachal Pradesh supplies power to Entire Arunachal Pradesh. Use this page to check APDOP / Dept. of Power's 2026-27 tariff and calculate your provisional bill.
Department of Power, Government of Arunachal Pradesh
APDOP / Dept. of Power scored 56.16 and ranks 10 of 11 state power departments — down a grade from the 13th report.
The rating scores the utility’s financial and operational performance — AT&C losses, billing and collection efficiency, the gap between what supply costs and what it earns, and the regulatory support the utility gets. It is not a measure of supply reliability or customer service, and it does not affect your tariff.
Domestic and non-commercial LT single-phase consumers.
Domestic LT - 3-phase 400 V
Domestic and non-commercial LT three-phase consumers.
Kutir Jyoti / BPL connection
Kutir Jyoti and BPL domestic connections.
Domestic HT - 11 kV
Domestic and non-commercial consumers supplied at 11 kV.
Domestic HT - 33 kV
Domestic and non-commercial consumers supplied at 33 kV.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model. Kutir Jyoti and BPL connections have a separate lower energy rate. Post-paid consumers receive a 3% rebate on current bills paid within the due date. Prepaid consumers receive a 5% rebate on recharge amount. Rebates are not automatically deducted by this calculator.
Category 2 - Commercial / Non-industrial
Supply type
Energy charge
Fixed charge
Duty & other
Commercial LT - 1-phase 230 V
Above 0units₹5.65/unit
₹0/mo
—
Commercial LT - 3-phase 400 V
Above 0units₹5.65/unit
₹0/mo
—
Commercial HT - 11 kV
Above 0units₹4.85/unit
₹0/mo
—
Commercial HT - 33 kV
Above 0units₹4.65/unit
₹0/mo
—
Who each rate applies to
Commercial LT - 1-phase 230 V
Commercial and non-industrial LT single-phase consumers.
Commercial LT - 3-phase 400 V
Commercial and non-industrial LT three-phase consumers.
Commercial HT - 11 kV
Commercial and non-industrial consumers supplied at 11 kV.
Commercial HT - 33 kV
Commercial and non-industrial consumers supplied at 33 kV.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model. Mixed domestic and commercial premises are treated as commercial when commercial load exceeds 10% of total connected load.
Category 3 - Public lighting and water supply
Supply type
Energy charge
Fixed charge
Duty & other
Public lighting / water LT - 1-phase 230 V
Above 0units₹5.75/unit
₹0/mo
—
Public lighting / water LT - 3-phase 400 V
Above 0units₹5.75/unit
₹0/mo
—
Public lighting / water HT - 11 kV
Above 0units₹4.85/unit
₹0/mo
—
Public lighting / water HT - 33 kV
Above 0units₹4.65/unit
₹0/mo
—
Who each rate applies to
Public lighting / water LT - 1-phase 230 V
Public lighting and water supply LT single-phase consumers.
Public lighting / water LT - 3-phase 400 V
Public lighting and water supply LT three-phase consumers.
Public lighting / water HT - 11 kV
Public lighting and water supply consumers supplied at 11 kV.
Public lighting / water HT - 33 kV
Public lighting and water supply consumers supplied at 33 kV.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model.
Category 4 - Agricultural
Supply type
Energy charge
Fixed charge
Duty & other
Agricultural LT - 1-phase 230 V
Above 0units₹3.50/unit
₹0/mo
—
Agricultural LT - 3-phase 400 V
Above 0units₹3.50/unit
₹0/mo
—
Agricultural HT - 11 kV
Above 0units₹3.15/unit
₹0/mo
—
Agricultural HT - 33 kV
Above 0units₹3.05/unit
₹0/mo
—
Who each rate applies to
Agricultural LT - 1-phase 230 V
Agricultural LT single-phase consumers.
Agricultural LT - 3-phase 400 V
Agricultural LT three-phase consumers.
Agricultural HT - 11 kV
Agricultural consumers supplied at 11 kV.
Agricultural HT - 33 kV
Agricultural consumers supplied at 33 kV.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model.
Category 5 - Industrial
Supply type
Energy charge
Fixed charge
Duty & other
Industrial LT - 1-phase 230 V
Above 0units₹4.95/unit
₹0/mo
—
Industrial LT - 3-phase 400 V
Above 0units₹4.95/unit
₹0/mo
—
Industrial HT - 11 kV
Above 0units₹4.50/unit
₹0/mo
—
Industrial HT - 33 kV
Above 0units₹4.15/unit
₹0/mo
—
Industrial HT - 132 kV
Above 0units₹4.00/unit
₹0/mo
—
Who each rate applies to
Industrial LT - 1-phase 230 V
Industrial LT single-phase consumers.
Industrial LT - 3-phase 400 V
Industrial LT three-phase consumers.
Industrial HT - 11 kV
Industrial consumers supplied at 11 kV.
Industrial HT - 33 kV
Industrial consumers supplied at 33 kV.
Industrial HT - 132 kV
Industrial consumers supplied at 132 kV.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model. Non-industrial or commercial use within an industrial premises is treated as industrial only when it is below 10% of total connected load; otherwise separate metering/tariff applies.
Category 6 - Bulk mixed consumers
Supply type
Energy charge
Fixed charge
Duty & other
Bulk mixed HT - 11 kV
Above 0units₹4.40/unit
₹0/mo
—
Bulk mixed HT - 33 kV
Above 0units₹4.05/unit
₹0/mo
—
Bulk mixed HT - 132 kV and above
Above 0units₹3.90/unit
₹0/mo
—
Who each rate applies to
Bulk mixed HT - 11 kV
Bulk mixed consumers supplied at 11 kV.
Bulk mixed HT - 33 kV
Bulk mixed consumers supplied at 33 kV.
Bulk mixed HT - 132 kV and above
Bulk mixed consumers supplied at 132 kV and above.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model.
Category 7 - Temporary consumers
Supply type
Energy charge
Fixed charge
Duty & other
Temporary LT - 1-phase 230 V
Above 0units₹9.00/unit
₹0/mo
—
Temporary LT - 3-phase 400 V
Above 0units₹9.00/unit
₹0/mo
—
Who each rate applies to
Temporary LT - 1-phase 230 V
Temporary LT single-phase consumers.
Temporary LT - 3-phase 400 V
Temporary LT three-phase consumers.
ℹ️ APSERC continued a single-part retail tariff for FY 2026-27. The schedule has energy charges only; no fixed charge or minimum monthly charge is applied in this model. Temporary supply is for construction, repairs, ceremonies, exhibitions and similar short-duration uses normally not exceeding 90 days.
Estimate your APDOP / Dept. of Power bill
Enter your units and sanctioned load for an itemised APDOP / Dept. of Power estimate. The result breaks
the bill into energy charge, fixed or demand charge, FPPA, duty,
and late-payment surcharge where applicable.
Domestic supply. The bracket in each option is the eligibility
limit — pick the one your connection actually falls under, because the rates differ
sharply between them. For commercial supply, time-of-day, solar export or arrears, the
full calculator carries every field.
APDOP / Dept. of Power FPPA — latest verified rate and trend
Latest verified APDOP / Dept. of Power FPPA (Fuel and Power Purchase Adjustment)
Typical domestic examples for a 2 kW Category 1 - Residential / Domestic connection, computed with the same engine as the calculator. Use them as a quick sanity check; your actual bill changes with sub-category, arrears, FPPA, duty and billing-period length.
The slab-wise price of the units consumed during the billing period. In telescopic slabs, each band is billed at its own rate.
Fixed charge
A monthly charge linked to sanctioned load, connected load, billing demand or consumer category. It applies even when usage is low.
Electricity duty
A statutory government levy. Depending on the state, it may apply on energy charges, fixed charges, or selected bill components.
FPPA (Fuel and Power Purchase Adjustment)
Fuel and power-purchase adjustment. It changes more often than the base tariff and may appear as a charge or a credit.
Arrears
Unpaid balance, corrections, security-deposit adjustments or previous-cycle amounts carried into the current bill.
LPSC
Late Payment Surcharge on overdue amounts. Check the due date and pay through the official DISCOM channel to avoid it.
Frequently asked questions
How do I calculate my APDOP / Dept. of Power electricity bill?
Open the APDOP / Dept. of Power bill calculator, enter your units consumed and sanctioned load, and it applies the 2026-27 APDOP / Dept. of Power slab rates, fixed charge and other charges to produce an itemised provisional bill.
What is the cheapest domestic electricity rate on APDOP / Dept. of Power?
APDOP / Dept. of Power's domestic energy charge starts at ₹3 per unit and rises to ₹4.4 per unit in the highest slab (Category 1 - Residential / Domestic), plus a monthly fixed charge (latest available estimate). The full slab table is above.
How do I pay my APDOP / Dept. of Power electricity bill online?
Pay on the official APDOP / Dept. of Power portal at appdcl.in. Use this page first to check what your bill should be, then pay on the authentic source.
What is the late payment surcharge (LPSC) for APDOP / Dept. of Power?
APDOP / Dept. of Power levies a Late Payment Surcharge of 2% per month on overdue amounts. Our calculator can add LPSC and arrears to estimate your total payable.
APDOP / Dept. of Power consumer services
These services are provided by APDOP / Dept. of Power or the official state/DISCOM portal, not by TheDiscomBill. Use this block as a practical route map before you leave for the official site.
Pay bill or download bill
Use appdcl.in for the final bill, receipt and payment status. The calculator here is only for checking whether the charge lines look reasonable.
For supply, billing or meter complaints, use the official complaint portal first and keep the complaint number. The common electricity helpline in India is 1912 where supported by the state or DISCOM.
Apply for a new connection, ownership update or sanctioned-load change through the official portal. Match the load you apply for with the fixed-charge section in the tariff table below.
FY 2026-27 APSERC order on Petition TP-10 of 2025 for APDOP
Checked against the order
2026-08-28
Page updated
2 September 2026
Figures are provisional estimates built on publicly available Arunachal Pradesh tariff orders. Always verify against your official APDOP / Dept. of Power bill — rates vary by sub-category, slab and city.