Domestic LT
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| Domestic LT |
|
₹50/kW/mo | — |
ℹ️ Subsidised LT domestic tariff. Kutir Jyoti and HT domestic supply are separate categories in the order.
Power & Electricity Department, Government of Mizoram supplies power to Entire Mizoram. Use this page to check P&E Dept., Mizoram's 2026-27 tariff and calculate your provisional bill.
Official P&E Dept., Mizoram source ↗
P&E Dept., Mizoram distributes electricity across Entire Mizoram.
| Distribution company | Power & Electricity Department, Government of Mizoram |
|---|---|
| Short name | P&E Dept., Mizoram |
| State / UT | Mizoram |
| Rates status | Based on the 2026-27 tariff order (latest published data we have) |
| Domestic energy rate | ₹4.90 – ₹8.20 per unit |
| Official website | mizoram.gov.in ↗ |
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| Domestic LT |
|
₹50/kW/mo | — |
ℹ️ Subsidised LT domestic tariff. Kutir Jyoti and HT domestic supply are separate categories in the order.
| Supply type | Energy charge | Fixed charge | Duty & other |
|---|---|---|---|
| Commercial LT |
|
₹80/kW/mo | — |
ℹ️ Subsidised LT commercial tariff. The order excludes applicable taxes and duties from the tariff schedule.
Enter your units and sanctioned load for an itemised P&E Dept., Mizoram estimate. The result breaks the bill into energy charge, fixed or demand charge, FPPA, duty, and late-payment surcharge where applicable.
Domestic supply. The bracket in each option is the eligibility limit — pick the one your connection actually falls under, because the rates differ sharply between them. For commercial supply, time-of-day, solar export or arrears, the full calculator carries every field.
| Latest verified FPPA | Not available |
|---|---|
| Applicable period | No verified period in tracker |
| Last updated | 2 September 2026 |
| Official source | No verified FPPA source recorded yet |
Enter the surcharge printed on your bill manually in the calculator. Open the surcharge tracker.
Typical domestic examples for a 2 kW Domestic LT connection, computed with the same engine as the calculator. Use them as a quick sanity check; your actual bill changes with sub-category, arrears, FPPA, duty and billing-period length.
| Monthly consumption | Estimated bill |
|---|---|
| 200 units | ₹1,300 |
| 300 units | ₹2,120 |
| 500 units | ₹3,760 |
| 750 units | ₹5,810 |
The slab-wise price of the units consumed during the billing period. In telescopic slabs, each band is billed at its own rate.
A monthly charge linked to sanctioned load, connected load, billing demand or consumer category. It applies even when usage is low.
A statutory government levy. Depending on the state, it may apply on energy charges, fixed charges, or selected bill components.
Fuel and power-purchase adjustment. It changes more often than the base tariff and may appear as a charge or a credit.
Unpaid balance, corrections, security-deposit adjustments or previous-cycle amounts carried into the current bill.
Late Payment Surcharge on overdue amounts. Check the due date and pay through the official DISCOM channel to avoid it.
These services are provided by P&E Dept., Mizoram or the official state/DISCOM portal, not by TheDiscomBill. Use this block as a practical route map before you leave for the official site.
Use mizoram.gov.in for the final bill, receipt and payment status. The calculator here is only for checking whether the charge lines look reasonable.
For supply, billing or meter complaints, use the official complaint portal first and keep the complaint number. The common electricity helpline in India is 1912 where supported by the state or DISCOM.
Apply for a new connection, ownership update or sanctioned-load change through the official portal. Match the load you apply for with the fixed-charge section in the tariff table below.
If your P&E Dept., Mizoram connection has a prepaid smart meter, check recharge channels, low-balance rules and unit estimates before topping up.
Estimate rooftop-solar savings here, then use the official DISCOM or PM Surya Ghar process for the actual net-metering application.
| Tariff order / regulator | mzerc.mizoram.gov.in/uploads/attachments/2026/03/7be5860da7dbbda3560a7e255caff169/ped-to-26-27-khp27mar26-evng-with-sign.pdf |
|---|---|
| P&E Dept., Mizoram official information | mizoram.gov.in |
| Tariff effective from | in force from 1 Apr 2026 |
| Tariff basis | Subsidised tariff approved for FY 2026-27, effective 01-Apr-2026 |
| Checked against the order | 2026-08-28 |
| Page updated | 2 September 2026 |
Figures are provisional estimates built on publicly available Mizoram tariff orders. Always verify against your official P&E Dept., Mizoram bill — rates vary by sub-category, slab and city.